02 / THE HIGHWAY PROGRAMME

A national network.
A practical place to begin.

The final proposal starts with Beetham Highway and expands in four phases. Each corridor becomes part of a connected landscape system: designed for its setting, established with care and maintained to a shared standard.

Yellow poui flowering beside a roadside barrier
THE DEMONSTRATION CORRIDOR

Beetham sets
the standard.

From Barataria Overpass to the Lighthouse, the proposed first corridor makes the national ambition visible. Its role is to demonstrate how landscape design, road engineering and horticultural care work together before the programme expands.

≈ 5 kmproposed demonstration

Existing roadside photograph supplied as inspiration; not completed programme works.

THE PROPOSED ROLLOUT

Prove. Refine.
Connect.

Explore the four phases outlined in the final proposal.

01Beetham Highway+

Barataria Overpass → the Lighthouse

An approximately 5 km demonstration corridor would establish the national benchmark for planting systems, irrigation, visual quality and dependable maintenance.

3 months proposed
02Churchill Roosevelt Highway+

Barataria Overpass → Grand Bazaar

Extend the demonstration into a major commuter corridor, applying the standards established on Beetham while adapting the design to local roadway conditions.

3 months proposed
03Uriah Butler Highway+

Extend the network through the UBH corridor

Carry the landscape programme into central Trinidad, with Grand Bazaar Interchange treated as a distinct gateway requiring coordinated design and delivery.

3 months for the corridor · approximately 4 months for Grand Bazaar works
04Eastern airport gateway+

Churchill Roosevelt Highway → Piarco

Complete the eastern extension toward Piarco International Airport, creating a coherent landscape arrival experience for residents, visitors and returning nationals.

6 months proposed

Indicative implementation periods from the proposal, subject to design, permissions and delivery planning. These are not confirmed start dates or a cumulative programme schedule.

ONE LANGUAGE, DIFFERENT SETTINGS

Design the landscape
around the road.

01

Medians

Use in-ground planting, engineered irrigated planters or reservoir-based systems according to available space, soil access and engineering constraints.

02

Shoulders & verges

Create broader canopy and connected planting where the road reserve allows, using groundcover and a considered mix of flowering and evergreen vegetation.

03

Structures & gateways

Explore vertical greening on suitable walls and structures, alongside distinctive planting at interchanges and city entrances. Structural access and maintenance remain essential.

Every location requires assessment of sightlines, CCTV coverage, drainage, utility clearances, mature tree size and safe maintenance access.