
A Nation in Bloom
A NATION IN BLOOM / VOLUME 1
Executive Brief · Edited website edition · September 2026
1
EXECUTIVE BRIEF
A Nation in Bloom
Volume 1 — Highway Beautification
A national programme to transform priority highway corridors into
maintained, living landscapes.
Prepared by Narase Boodoosingh, BSc (Agron) — PROLAS Ltd
For executive review
Edited from the supplied executive brief. Programme proposals and technical specifications remain subject to
review and approval.
Page 1 of 8
Treat the highway landscape as infrastructure
A NATION IN BLOOM / VOLUME 1
Executive Brief · Edited website edition · September 2026
2
THE PROPOSITION
Treat the highway landscape as
infrastructure
A national programme
A Nation in Bloom proposes to transform priority highway corridors in Trinidad and Tobago into
maintained landscapes that express national pride, support appropriate biodiversity and improve the
everyday journey. The programme begins with highway beautification; a subsequent volume
addresses public spaces.
The programme
Reclaim, Green, Sustain. Three priority corridors connect through the Grand Bazaar Interchange and
are subdivided into manageable sections. A published National Highway Landscape Policy would
guide design, safety, species selection, signage and maintenance.
Clean before planting
Clear, drain and prepare each section to an agreed baseline before planting begins. Cleanup is a
defined stage with its own acceptance criteria.
Demonstrate and learn
The brief proposes a 4.8 km Beetham Highway demonstration section, from Barataria Overpass to the
St Vincent Jetty Lighthouse. Confirm boundaries and engineering requirements with the responsible
authorities before implementation.
Publish the standard and share responsibility
Define planting locations, clear zones, sightlines, species eligibility, recognition rules and a five-year
maintenance obligation. Establish transparent participation routes for qualified professionals, corporate
organisations and community groups.
Page 2 of 8
A cared-for corridor is part of national wellbeing
A NATION IN BLOOM / VOLUME 1
Executive Brief · Edited website edition · September 2026
3
THE CASE FOR CHANGE
A cared-for corridor is part of national
wellbeing
The environment of everyday journeys
Highway corridors form a visible part of daily life and the visitor experience. Exposed concrete, litter
and unmanaged vegetation create opportunities for renewal. Landscape quality should be considered
alongside safety, maintenance and environmental stewardship.
Shade and the road environment
The source brief cites research on relationships between tree shade and pavement condition
(McPherson and Muchnick, 2005). Appropriate canopy may offer benefits, but findings from other
settings require local assessment. Planting must respect road geometry, visibility and infrastructure.
Water and establishment
A dependable irrigation strategy is central to plant establishment. Assess suitable supply sources,
including non-potable or treated water where appropriate, with WASA and the relevant authorities.
Water availability, quality, efficiency and maintenance access should be resolved before planting.
Skills and professional care
The programme creates opportunities to develop expertise in arboriculture, irrigation maintenance,
traffic management, plant health and nursery production. Training and clear responsibilities support
consistent care over time.
Measure the outcomes
Record baseline conditions and assess landscape quality, plant survival, irrigation performance and
safety. Environmental and social benefits are proposed outcomes, rather than guaranteed results.
Page 3 of 8
One interchange connects three priority corridors
A NATION IN BLOOM / VOLUME 1
Executive Brief · Edited website edition · September 2026
4
THE NETWORK
One interchange connects three priority
corridors
The demonstration section
Beetham Highway: Barataria Overpass to the St Vincent Jetty Lighthouse. The source brief proposes
an approximately 4.8 km section. Extent, cross-sections and works limits remain subject to
confirmation.
Corridor 1 - Eastern Gateway
Grand Bazaar to Piarco International Airport: a coherent arrival experience and an opportunity to
express the natural character of Trinidad and Tobago.
Corridor 2 - Central Spine
Grand Bazaar to Chaguanas: a priority connection serving journeys into central Trinidad.
Corridor 3 - Capital Approach
Grand Bazaar to Port of Spain: a maintained gateway on the daily approach to the capital.
Why the Beetham is proposed
The source identifies the Lighthouse, Beetham landfill and nearby Caroni Swamp as significant
features of the wider setting. These adjacencies call for coordinated environmental planning and
careful consideration of sensitive areas.
Deliver in defined sections
The brief proposes sections of one to two kilometres, bounded by recognisable features such as
interchanges, overpasses and bridges. This supports phased work, planned traffic management,
adoption responsibilities and comparison of maintenance performance. Alignments are indicative, not
construction instructions.
Page 4 of 8
Reclaim · Green · Sustain
A NATION IN BLOOM / VOLUME 1
Executive Brief · Edited website edition · September 2026
5
DELIVERY
Reclaim · Green · Sustain
1 / Reclaim
Remove debris, litter and dumped material. Clear and inspect drainage. Manage invasive vegetation
without burning arisings. Prepare and grade suitable areas, and reconcile utility information. Sign off
site readiness before the next stage.
2 / Green
Establish appropriate median, shoulder and interchange planting. Consider in-ground planting where
suitable and keep shoulder treatment outside required clear zones. Install irrigation before planting.
Assess independent frames for vertical greening where engineering conditions permit.
3 / Sustain
Provide establishment care through dry seasons; formative and structural pruning; irrigation monitoring
and leak detection; and inspection of sightlines and clear zones. The source proposes survival audits
at 12, 36 and 60 months.
A published planting standard
Define suitable planting by road cross-section and site conditions. Narrow medians and ramp conflict
areas need particular attention to low-growing treatment and visibility. Wider spaces may
accommodate selected trees after assessment. Species, spacing and setbacks require approval by
the relevant professionals and road authority.
Ecological suitability
The source excludes African tulip from its proposed palette and raises concerns about invasive
behaviour, bee impacts, brittle branches and roots. Assess all candidate species for local ecological
suitability, mature size, root behaviour, litter, water demand and safety. No plant type should be
assumed harmless to buried services.
Page 5 of 8
A shared framework for lasting stewardship
A NATION IN BLOOM / VOLUME 1
Executive Brief · Edited website edition · September 2026
6
PARTNERSHIP
A shared framework for lasting
stewardship
Corporate corridor adoption
Organisations may adopt defined sections under a transparent framework, with work undertaken by
qualified contractors. Recognition should comply with published signage rules. The source proposes a
minimum three-year adoption term, to be reconciled with longer maintenance obligations.
Community corridor adoption
Community organisations, NGOs, schools and faith groups may support defined activities under
supervision, with appropriate training and equipment. Participation beside live traffic must follow
road-authority safety requirements.
Public oversight
Design control, species approval and inspections remain with the responsible authority. Establish
written obligations, inspection schedules, performance measures and arrangements for replacement
or withdrawal.
International experience
The source identifies Texas Adopt-a-Highway, California’s Caltrans adoption programme, India’s
Green Highways Policy and Barbados’ beautification pilot as examples for further review. Relevant
lessons include written maintenance schedules, contractor accreditation, monitored plant survival and
support for local landscape enterprises.
Open participation
The proposed framework should be open to qualified providers. Publish eligibility criteria, landscape
standards and adoption records so that the programme operates as a national initiative with clear
accountability.
Page 6 of 8
Five decisions for government consideration
A NATION IN BLOOM / VOLUME 1
Executive Brief · Edited website edition · September 2026
7
THE REQUEST
Five decisions for government
consideration
1 / Designate a demonstration corridor
Consider the proposed Beetham Highway section, confirm its boundaries and deliver it to an agreed
standard. Use the demonstration to establish performance evidence and practical lessons before
expanding.
2 / Establish a corridor rights framework
Define the basis for adopting parts of the highway estate: duration, obligations, landscape standards,
recognition and signage, inspections, and arrangements when an adoption ends.
3 / Resolve the water supply
Determine suitable irrigation sources with WASA, including the feasibility of non-potable and treated
supplies. Address availability, quality, reliability and efficient use.
4 / Direct utility pre-clearance
Coordinate infrastructure records from WASA, T&TEC;, TSTT, the National Gas Company and the
relevant engineering department. Confirm security-camera sightlines with National Security before
excavation or planting.
5 / Establish multi-year maintenance
Make establishment care, inspection and replacement a condition of implementation. Set
responsibilities and a written programme for watering, weeding, pruning, irrigation checks and survival
reviews.
Page 7 of 8
What the nation can gain
A NATION IN BLOOM / VOLUME 1
Executive Brief · Edited website edition · September 2026
8
THE NATIONAL BENEFIT
What the nation can gain
For the road environment
A maintained landscape, appropriate shade, erosion-management opportunities and a clear standard
for third-party works. Benefits depend on site conditions, engineering requirements and continued
care.
For people and skills
More welcoming journeys, a visible expression of civic care, opportunities for community participation
and development of a skilled landscape-maintenance sector.
For nature
Appropriate nectar and larval host planting, attention to sensitive ecological areas, and opportunities
for shade and habitat. Environmental objectives should be measured and proportionate to the
programme’s actual scale.
Evidence and its limits
The source cites Branas et al. (PNAS, 2018) on neighbourhood greening, Parsons et al. (1998) on
roadside nature and stress, Iungman et al. (The Lancet, 2023) on urban trees and heat, and Hilbert et
al. (2019) on tree mortality. These studies concern different settings; they inform the rationale but do
not establish the effects of this proposed programme.
The commitment that connects everything
The benefits depend on established plants and maintained landscapes. Tree-level records,
professional care, skills development and suitable nursery stock support delivery. The poui provides a
symbol of resilience and renewal: through a shared standard and sustained stewardship, a nation can
bloom.
Page 8 of 8